Interiors are not a later problem
Most of what makes a room work was decided months earlier, while the walls were still open.
ReadWriting on designing and building well in Nairobi, and on doing it for clients who are far from the site.
Most of what makes a room work was decided months earlier, while the walls were still open.
ReadA milestone that looks like a finished house from the road and is nowhere near one inside.
ReadThree different appointments, three different sets of risk. Knowing which one you want changes the conversation.
ReadA sloping plot is usually sold as a problem. It is mostly a substructure decision made early.
ReadMachine-cut, hand-dressed or rock-faced. The same quarry gives three very different buildings.
ReadA pitched roof you cannot see. It is a clean line from the street and a harder detail on site.
ReadSalt, humidity and a very hard light. Coastal construction punishes the shortcuts that inland sites forgive.
ReadThe contract sum is the number everyone watches. These are the ones that quietly decide whether a project finishes calmly.
ReadPhotographs flatter a building site. Knowing what a month should actually contain is what keeps a remote client in control.
ReadBetween the drawing and the wall there is a gap. Most of what goes wrong on a build happens inside it.
ReadA finish that looks good on handover day is easy. One that looks good in ten years is a different decision.
Read